GEOTECHNICAL & ENVIRONMENTAL SOLUTIONS
Alliance Geotechnical have undertaken a range of works on the Sydney Light Rail project with practical input and results that have been very well received. These services include redesign and realignment of the tunnel access ramp; crane and piling platform assessments (for both earthworks options and the alternative use of steel plates), Cone Penetration testing for verification and assessment of ground conditions; temporary sheet pile shoring designs for building and structure excavations; earthworks compaction and verification testing.